AfDB publishes a staged nonsovereign application process and an explicit later-stage documentation package, including a full-scope feasibility study.
Keep the requirement attached to its stage
The official private-sector guidance begins with eligibility and preliminary assessment. Its later-stage funding documentation includes a feasibility study covering the full project scope and commercial viability, a business plan and a financing plan. This is a specific published requirement, not evidence that every first contact or intermediary borrower follows the same route.
Include the supporting project, not only the main asset
The published list addresses ownership, relevant financial history, contracts, applicable environmental studies, EPC and operating procurement, and practical arrangements such as utilities, waste and transport. Identify dependencies outside the immediate construction site and establish who delivers and funds them.
Reconcile equity timing and implementation
A financing structure should show when equity is available and how the project reaches operation. Construction delay, utility readiness and uncompleted contracts can create funding gaps. The study should identify those issues instead of treating the existence of a positive base-case return as evidence of approval readiness.
- Confirm regional and organizational eligibility.
- Identify the actual submission stage.
- Assemble the full-scope documentation.
- Retain applicability qualifications and unresolved items.
Methodology, source boundaries and review
This is original analytical commentary based on the official documents linked below. Institutional policy statements and the firm's practical analytical recommendations are not the same thing. Sources are identified by institution, document and actual retrieval date; a missing publication date is not replaced with a copyright year or guessed date.
Requirements can change with the instrument, sovereign status, country, project risk, preparation stage and financing agreement. Historical documents are labeled as such. Obtain the current written request and appropriately qualified technical, environmental, legal and tax advice where relevant. No institution-specific client engagement, approval, affiliation or financing outcome is claimed.
Source register
