Skip to content
Independent analysis for capital decisions
Wert-Berater Financial

EBRD countries of operations, subject to current mandate · multilateral

European Bank for Reconstruction and Development

Project investment and transition impact, with banking, integrity and environmental and social assessment; eligibility must be confirmed against current EBRD operations.

Confirm the project's current EBRD country-of-operation eligibility · Public and private operations; financing terms and applicable policy depend on the transaction

Financing focus

What EBRD finances

Eligible infrastructure, energy, industrial, agribusiness and financial-sector investment in EBRD countries of operations, using transaction-specific lending, equity, guarantees or other agreed structures.

Financing products and routes in the reviewed sources

  • Project lending
  • Equity
  • Guarantees
  • Transaction-specific financing structures

These examples describe the reviewed routes, not a complete product catalogue or an eligibility determination. Current country, borrower, financing and procurement conditions must be confirmed for the actual project.

Sources: EBRD: Environmental and Social Policy 2024 · EBRD: Guide to financing (September 2013)

Independent study services

How Wert-Berater Financial can support your feasibility study

Wert-Berater Financial can prepare a scoped feasibility study, financial model and market assessment, testing commercial viability and documenting risks against the actual EBRD-related project request.

Potential analytical scope

  • Demand, competitive position and operating assumptions.
  • Cash flow, financing structure and downside cases.
  • Implementation dependencies and specialist findings requiring follow-up.

Feasibility requirements for the reviewed route

Project-specific

Agree the feasibility scope with the project team and financing product. A current, universal feasibility-report mandate was not established by the reviewed current policy landing page; historical financing guidance must not be presented as a new requirement.

Sources: EBRD: Environmental and Social Policy 2024

We agree the scope against the actual lender request or terms of reference and identify source gaps, assumptions and specialist responsibilities. Engineering design, environmental certification, legal opinions and other licensed conclusions require appropriately qualified specialists. An independent study does not guarantee lender acceptance, financing or a consultant appointment.

Prepare an independent project assessment
01

About EBRD: profile and operating context

An EBRD preparation assignment must distinguish current policy from historical financing literature. The official Environmental and Social Policy 2024 landing page describes the Bank's assessment and monitoring responsibilities and the responsibilities of clients throughout the project life cycle.

The current terminology is Environmental and Social Requirements, or ESRs; older material refers to Performance Requirements. The financing agreement and policy transition provisions determine the applicable regime. A September 2013 financing guide is retained here only as a dated historical reference, not as evidence of current financing ceilings, eligible-country lists or a universal application package.

Sectors in scope

  • Infrastructure
  • Energy
  • Industry
  • Agribusiness
  • Financial institutions
02

Connect the environmental plan to the financial case

An environmental and social action plan can change capital spending, project timing, operating staffing and the cost of monitoring. A financial model that excludes those obligations can overstate cash available for debt service. Record the responsible specialist, timing and funding of each material action, and make delayed permitting or implementation visible in the scenarios.

For an operating investment, distinguish historical practices from the performance needed after the proposed financing. A favorable site description is not evidence that corrective actions have been completed; the study should retain unresolved findings and their possible effect on cost, schedule and project viability.

Sources: EBRD: Environmental and Social Policy 2024

03

Avoid historical product terms and implied appointments

The 2013 financing guide describes proposal preparation and financing structures in its historical setting. It is useful only when its date is made clear. A current assignment should obtain the latest product information, country eligibility and diligence request directly from the EBRD or the responsible client; no approved-provider status follows from using those documents.

Sources: EBRD: Guide to financing (September 2013) · EBRD: Environmental and Social Policy 2024

04

Agree the analytical assignment before commissioning

For a EBRD-related assignment, identify the contracting party, financing product, project stage and the actual terms of reference first. A sponsor's study, a lender-appointed independent review and a competitively procured consultancy have different responsibilities, reliance provisions and deliverables.

Wert-Berater Financial can provide independent feasibility analysis, market research, financial modeling, economic analysis and agreed monitoring within its verified capabilities. Engineering design, legal opinions, environmental certification and other licensed work require appropriately qualified specialists. No institution-specific engagement or accreditation is claimed on this page.

The proposed scope should identify the information to be supplied, assumptions requiring verification, reporting currency, scenarios, review responsibility and permitted reliance. A study can identify unresolved risks or an unviable case; it cannot guarantee financing or replace the institution's own appraisal and credit decision.

Requirement register

What the reviewed sources say

Status labels describe the supplied source record, not a universal lender rule. Check the underlying document and current financing instrument.

TopicStatusInstrument / sovereign contextReviewed summarySources
feasibilityProject-specificProject preparation and applicable 2024 environmental and social policy · instrument_specificAgree the feasibility scope with the project team and financing product. A current, universal feasibility-report mandate was not established by the reviewed current policy landing page; historical financing guidance must not be presented as a new requirement.EBRD: Environmental and Social Policy 2024
financialProject-specificProject preparation and applicable 2024 environmental and social policy · instrument_specificA transaction needs a defensible commercial and funding case, but the reviewed current environmental-policy page does not prescribe a universal financial-model format or minimum ratio.EBRD: Environmental and Social Policy 2024
economicProject-specificProject preparation and applicable 2024 environmental and social policy · instrument_specificThe development and transition rationale should be addressed in the actual appraisal scope. Do not infer a fixed economic-return threshold from an environmental-policy reference.EBRD: Environmental and Social Policy 2024
technicalProject-specificProject preparation and applicable 2024 environmental and social policy · instrument_specificTechnical assumptions and project design must be consistent with the assessed environmental and social risks. Required independent engineer or other technical appointments remain transaction-specific.EBRD: Environmental and Social Policy 2024
environmental_socialExplicitly requiredProject preparation and applicable 2024 environmental and social policy · instrument_specificThe 2024 policy sets minimum environmental and social requirements and defines client and Bank responsibilities. Identify the applicable ESRs and transition arrangements for the operation before deciding which studies are needed.EBRD: Environmental and Social Policy 2024
procurementProject-specificProject preparation and applicable 2024 environmental and social policy · instrument_specificThe EBRD's own purchasing and client project procurement are separate routes. A project notice and its procurement documents, not this policy summary, establish a specific consultant opportunity.EBRD: Environmental and Social Policy 2024

Related sectors

Follow the project thread.

Energy Project Feasibility

Assess the demand, technical solution, fuel or resource supply, contractual revenues, investment requirements and financial resilience of an energy project.

Renewable Energy Feasibility

Examine resource-supported production, grid connection, offtake, construction, operating costs and financing resilience for renewable-energy investment.

Industrial Project Feasibility

Test the market, production plan, input supply, technology, site, investment and operating economics of an industrial development or expansion.

Hospitality Project Feasibility

Assess a hospitality investment's achievable demand, competitive position, development cost, operating model, financing and resilience rather than relying on destination-wide tourism totals.

Commercial Real Estate Feasibility

Evaluate the location, market absorption, leasing, development cost, operating cash flow and financing risks of a commercial property investment.

Transportation Project Feasibility

Analyze travel or freight demand, alternatives, service performance, capital and operating costs, financing and economic benefits of transportation investment.

Source register

Documents behind this page

  1. EBRD: Environmental and Social Policy 2024 Checked 2026-11-22 · Current official policy landing page, including Environmental and Social Requirements terminology; confirm the applicable agreement and transition provisions.
  2. EBRD: Guide to financing (September 2013) Checked 2026-11-22 · Historical guide, not evidence of current financial limits, eligible countries or universal application requirements.
  3. ebrd procurement — official procurement information Checked 2026-11-22 · Official procurement information was retrieved. Portal access is not a consultant registration, shortlist, contract award or claim that any individual notice is still open.

Funding the preparation stage

Some institutional arrangements can support eligible preparation costs. Applicant restrictions, procurement rules, repayment provisions and current availability must be checked separately.

Read the project preparation funding guide

Continue the review

Related requirements and analytical services

Global — eligible World Bank borrowing countries

World Bank

Development financing and knowledge for public priorities, with project, results-based and policy instruments that must not be treated as one application product.

Developing IFC member countries

International Finance Corporation

Private-sector development investment in eligible developing countries, subject to technical soundness, commercial prospects, development benefits and environmental and social acceptability.

European Union and eligible operations outside the EU

European Investment Bank

Investment aligned with EIB and European Union objectives, assessed for eligibility and project quality rather than solely the sponsor's projected return.

All development-finance research · Discuss financial modeling · Institutional team or procuring authority?

Questions in context

Frequently asked questions

Does every EBRD application require the same feasibility report?

A single current feasibility-report mandate was not established by the current policy source reviewed here. Confirm the financing product and written diligence request. Do not treat the dated 2013 guide as current transaction terms.

Does commissioning Wert-Berater secure a development-bank loan or consultant appointment?

No. Wert-Berater Financial is an independent analytical services firm, not a lender, financing intermediary or authorized representative of the institutions listed. Financing and procurement decisions remain with the responsible institution or contracting authority.

What should I provide for a EBRD-related scope discussion?

Provide the country, sponsor or public promoter, proposed financing structure, project stage, existing study and model, the applicable E&S policy or agreement references, action-plan information and any current procurement or diligence request.

01

Start with the project, not a financing promise

Share enough context to scope an independent analytical discussion. Required fields are marked.

Institution of interest

EBRD

Enter an amount only when known. Do not include a currency symbol.
Enter an amount only when known. Do not include a currency symbol.
Required if either amount is supplied. Currency is never assumed.
Up to 3 files; 10 MiB combined. PDF, DOCX, XLSX, PNG or JPG. Files are retained privately for intake, not published or shared through public links. Do not send privileged or highly sensitive records.

No information is sent until you select Submit. An inquiry is not a financing application, approval or promise of funding.

Independent analytical support

Prepare the evidence, without implying a lender relationship.

Engagement scope, deliverables and reliance are agreed separately. Specialist legal, engineering and environmental work may require separate qualified professionals.

Prepare an independent project assessment

Country and regional connections

Continue the regional analysis

These are research connections, not determinations of country eligibility, financing availability or institutional affiliation. Confirm the country, financing instrument and institution mandate for the actual project.

Engagements Completed
4,000+
SBA Studies Accepted by Lenders
1,300+
USDA Studies in Agency Financing
950+
Project Value Evaluated
$43.8B
Feasibility Consultants Since
1998

Thousands of real estate, business, and machinery appraisal and litigation assignments.