Infrastructure Project Feasibility
Assess the need, alternatives, delivery structure, financial sustainability and development benefits of an infrastructure investment before treating it as ready for financing.
Eligible ADB developing member countries · multilateral
Development investment in Asia and the Pacific, with commercial, financial, economic and safeguard assessment appropriate to the selected operation.
Financing focus
Development investment in Asia and the Pacific, including infrastructure, energy, transport, water, industry and financial institutions. Public-sector and private-sector financing follow different processes.
These examples describe the reviewed routes, not a complete product catalogue or an eligibility determination. Current country, borrower, financing and procurement conditions must be confirmed for the actual project.
Independent study services
Wert-Berater Financial can prepare or independently review feasibility studies, business-plan analysis and financial models for the selected ADB financing route and due-diligence request.
Generally expected
The private-sector process includes review of feasibility studies and the business plan during due diligence. The precise package depends on project needs and the team’s request.
Sources: ADB: Private-sector project approval process
We agree the scope against the actual lender request or terms of reference and identify source gaps, assumptions and specialist responsibilities. Engineering design, environmental certification, legal opinions and other licensed conclusions require appropriately qualified specialists. An independent study does not guarantee lender acceptance, financing or a consultant appointment.
Prepare an independent project assessmentADB's published private-sector approval process proceeds from concept review and a mandate letter into detailed due diligence, investment review, documentation and approval. The sponsor should distinguish that nonsovereign process from ADB's separate public-sector project cycle.
The published diligence scope includes economic, financial, commercial, business-plan, legal and feasibility work, with environmental and social studies and plans where applicable. Large or complex transactions can require independent legal, technical and environmental specialists. Those appointments and their costs should be agreed rather than assumed to be included in one general consultant's fee.
The transition from an initial concept to diligence is a useful point to agree the model, contracts and specialist reports that the investment review will actually examine. A sponsor should not commission overlapping studies before establishing who will rely on them, what gaps remain and whether an independent appointment is required.
For a renewable-energy or transport investment, reconcile construction assumptions and commissioning with the ramp-up of revenues and debt service. Test which contracts allocate demand, resource, tariff and completion risk. Merely labeling a forecast bankable does not resolve an unsupported offtake or a missing approval.
A ministry's public investment program may use a different preparation route, procurement framework and implementation arrangements from a privately sponsored financing. State the borrower, guarantor if any and applicable operation type before specifying economic analysis, financial due diligence or the consultant-selection process.
For a ADB-related assignment, identify the contracting party, financing product, project stage and the actual terms of reference first. A sponsor's study, a lender-appointed independent review and a competitively procured consultancy have different responsibilities, reliance provisions and deliverables.
Wert-Berater Financial can provide independent feasibility analysis, market research, financial modeling, economic analysis and agreed monitoring within its verified capabilities. Engineering design, legal opinions, environmental certification and other licensed work require appropriately qualified specialists. No institution-specific engagement or accreditation is claimed on this page.
The proposed scope should identify the information to be supplied, assumptions requiring verification, reporting currency, scenarios, review responsibility and permitted reliance. A study can identify unresolved risks or an unviable case; it cannot guarantee financing or replace the institution's own appraisal and credit decision.
Requirement register
Status labels describe the supplied source record, not a universal lender rule. Check the underlying document and current financing instrument.
| Topic | Status | Instrument / sovereign context | Reviewed summary | Sources |
|---|---|---|---|---|
| feasibility | Generally expected | Private-sector financing approval and due diligence · nonsovereign | The private-sector process includes review of feasibility studies and the business plan during due diligence. The precise package depends on project needs and the team’s request. | ADB: Private-sector project approval process |
| financial | Generally expected | Private-sector financing approval and due diligence · nonsovereign | Due diligence examines financial and commercial viability. Make the financing, construction drawdown, operating cash flows and material downside assumptions traceable to evidence. | ADB: Private-sector project approval process |
| economic | Generally expected | Private-sector financing approval and due diligence · nonsovereign | Economic assessment is part of private-sector diligence. Development benefits and additionality should be explained separately from the sponsor's distributable cash or equity IRR. | ADB: Private-sector project approval process |
| technical | Project-specific | Private-sector financing approval and due diligence · nonsovereign | Large or complex projects may need independent technical experts. Identify design, resource, performance and completion risks and the specialist reports that support them. | ADB: Private-sector project approval process |
| environmental_social | Project-specific | Private-sector financing approval and due diligence · nonsovereign | The published process includes environmental and social assessment and relevant resettlement or Indigenous Peoples plans. Confirm the current policy and any transition rules; a process page alone does not establish the applicable policy version. | ADB: Private-sector project approval process |
| procurement | Project-specific | Private-sector financing approval and due diligence · nonsovereign | Determine whether the consultant is retained by the sponsor, lenders or a public executing agency. The mandate and tender documents govern the appointment and the allocation of diligence costs. | ADB: Private-sector project approval process |
Related sectors
Assess the need, alternatives, delivery structure, financial sustainability and development benefits of an infrastructure investment before treating it as ready for financing.
Assess the demand, technical solution, fuel or resource supply, contractual revenues, investment requirements and financial resilience of an energy project.
Examine resource-supported production, grid connection, offtake, construction, operating costs and financing resilience for renewable-energy investment.
Assess service needs, resource or treatment capacity, technical alternatives, tariffs and collections, operating sustainability and public benefits for water and wastewater investment.
Evaluate freight demand, network position, throughput, contracts, capacity, investment and operating economics for logistics facilities and supporting infrastructure.
Analyze travel or freight demand, alternatives, service performance, capital and operating costs, financing and economic benefits of transportation investment.
Source register
Some institutional arrangements can support eligible preparation costs. Applicant restrictions, procurement rules, repayment provisions and current availability must be checked separately.
Read the project preparation funding guideContinue the review
Global — eligible World Bank borrowing countries
Development financing and knowledge for public priorities, with project, results-based and policy instruments that must not be treated as one application product.
Developing IFC member countries
Private-sector development investment in eligible developing countries, subject to technical soundness, commercial prospects, development benefits and environmental and social acceptability.
European Union and eligible operations outside the EU
Investment aligned with EIB and European Union objectives, assessed for eligibility and project quality rather than solely the sponsor's projected return.
Bankable describes an evidenced investment and risk-allocation case for a particular financing decision, not a guarantee or a label an adviser can award universally.
Define whether the operation is sovereign or private-sector, then align preparation evidence, independent advice, funding and the next review stage.
Risk analysis should reveal which assumptions cause loss, liquidity pressure or failure to meet obligations, and which responses are genuinely available.
All development-finance research · Discuss financial modeling · Institutional team or procuring authority?
Questions in context
The reviewed private-sector process includes feasibility and business-plan assessment in due diligence; the scope is transaction-specific. This is not a claim that every public- and private-sector first contact has the same report requirement.
No. Wert-Berater Financial is an independent analytical services firm, not a lender, financing intermediary or authorized representative of the institutions listed. Financing and procurement decisions remain with the responsible institution or contracting authority.
Provide the country, public or private sponsor, project stage, financing proposal, mandate or diligence request if available, key contracts, technical studies, environmental status and existing model.
Independent analytical support
Engagement scope, deliverables and reliance are agreed separately. Specialist legal, engineering and environmental work may require separate qualified professionals.
Prepare an independent project assessmentCountry and regional connections
These are research connections, not determinations of country eligibility, financing availability or institutional affiliation. Confirm the country, financing instrument and institution mandate for the actual project.
Thousands of real estate, business, and machinery appraisal and litigation assignments.