Sector preparation guide

Water and Wastewater Feasibility

Assess service needs, resource or treatment capacity, technical alternatives, tariffs and collections, operating sustainability and public benefits for water and wastewater investment.

Analytical frame

Use the following material to structure diligence questions. Project economics and documentation vary by context; this guide is not a lender requirement or eligibility determination.

Assess service needs, resource or treatment capacity, technical alternatives, tariffs and collections, operating sustainability and public benefits for water and wastewater investment.

Begin with the financing instrument, sponsor, project location and the decision the analysis must support. The institutions linked below are research references, not a determination of project eligibility, a funding offer or evidence of a relationship with Wert-Berater Financial.

01

Separate service coverage from billable consumption

Define households, businesses or other users, service levels, connection uptake, metering, losses and actual collection. Planned population coverage is not automatically billed and collected revenue. Existing system performance and the effects of the proposed works should be measured against a clear baseline.

Sources: World Bank: Project cycle · EIB: Project cycle and proposal preparation · CAF: Products, services and project loans · CDB: Climate Change Project Preparation Fund

02

Compare technically credible alternatives

Resource availability, treatment process, discharge requirements, network condition, sludge or waste handling and energy use require suitable engineering and environmental inputs. Compare rehabilitation, demand management and staged works where appropriate, not only a preferred new plant.

Sources: World Bank: Project cycle · EIB: Project cycle and proposal preparation · CAF: Products, services and project loans · CDB: Climate Change Project Preparation Fund

03

Show the funding of service over its life

Tariffs, affordability, subsidy commitments, electricity, chemicals, staffing, maintenance and replacement capital belong in one coherent financial case. Wider health and environmental benefits belong in the economic analysis, not in the utility's cash account. Identify the authority responsible for any continuing funding gap.

Sources: World Bank: Project cycle · EIB: Project cycle and proposal preparation · CAF: Products, services and project loans · CDB: Climate Change Project Preparation Fund

04

Include resilience and implementation responsibilities

Climate, flood, drought and source risks may affect design, timing and operating cost. Identify land, permits, procurement packages and the operator's capacity to run the asset. Monitoring should compare actual service, losses, collections and expenses with the original assumptions as well as reporting construction progress.

Sources: World Bank: Project cycle · EIB: Project cycle and proposal preparation · CAF: Products, services and project loans · CDB: Climate Change Project Preparation Fund

Institutions in this research set

Related institution profiles

Association here reflects the catalog’s researched links, not an indication of financing availability.

Global — eligible World Bank borrowing countries

World Bank

Development financing and knowledge for public priorities, with project, results-based and policy instruments that must not be treated as one application product.

European Union and eligible operations outside the EU

European Investment Bank

Investment aligned with EIB and European Union objectives, assessed for eligibility and project quality rather than solely the sponsor's projected return.

Eligible ADB developing member countries

Asian Development Bank

Development investment in Asia and the Pacific, with commercial, financial, economic and safeguard assessment appropriate to the selected operation.

Eligible AIIB members and qualifying operations

Asian Infrastructure Investment Bank

Infrastructure investment with project-specific technical, economic, financial, environmental, social and implementation assessment.

Latin America and the Caribbean

Inter-American Development Bank

Development financing for public priorities in Latin America and the Caribbean, informed by country strategies, project quality, development effectiveness and implementation capacity.

Caribbean borrowing member countries

Caribbean Development Bank

Caribbean development financing and preparation support, including a specific climate-preparation facility for eligible Borrowing Member Countries.

Source register

Documents behind this page

  1. World Bank: Project cycle Checked 2026-11-22 · The reviewed page describes the unified operating model introduced in 2026; instrument-specific responsibilities still differ.
  2. EIB: Project cycle and proposal preparation Checked 2026-11-22 · Current project-cycle guidance; no single standardized documentation requirement is asserted.
  3. CAF: Products, services and project loans Checked 2026-11-22 · Distinguishes project loans, programs, financial partners and advisory services.
  4. CDB: Climate Change Project Preparation Fund Checked 2026-11-22 · A specific climate-preparation facility launched in 2025 for Borrowing Member Countries, not an unrestricted grant for any private study.

Questions in context

Frequently asked questions

Does a water and wastewater feasibility guarantee financing?

No. A study can establish limitations, unresolved risks or an unviable case. Eligibility, due diligence and approval remain with the responsible institution and contracting parties.

Can one consultant certify every specialist aspect?

No. Financial and economic analysis must use appropriate technical, environmental, legal, tax and other specialist inputs. Responsibility, qualifications and permitted reliance should be agreed in the engagement scope.

Next step

Set the scope before building the model.

Request a discussion about independent analysis for this sector. Nothing is submitted to a lender from this page.

Prepare an independent project assessment
Engagements Completed
4,000+
SBA Studies Accepted by Lenders
1,300+
USDA Studies in Agency Financing
950+
Project Value Evaluated
$43.8B
Feasibility Consultants Since
1998

Thousands of real estate, business, and machinery appraisal and litigation assignments.