Skip to content
Independent analysis for capital decisions
Wert-Berater Financial

Latin America and the Caribbean · regional

CAF — Development Bank of Latin America and the Caribbean

Financial and advisory support for development in shareholder countries, including public and private investment, programs and financing through financial partners.

CAF shareholder-country operations subject to product eligibility · Public, private and mixed-sector clients; project, program and intermediary routes differ

Financing focus

What CAF finances

Public and private development investment in shareholder countries, including infrastructure, water, transport, energy, urban development and industry, through project, program, corporate and financial-partner channels.

Financing products and routes in the reviewed sources

  • Project loans
  • Program loans
  • Corporate and other eligible lending
  • Financial-partner support
  • Advisory services

These examples describe the reviewed routes, not a complete product catalogue or an eligibility determination. Current country, borrower, financing and procurement conditions must be confirmed for the actual project.

Sources: CAF: Products, services and project loans · CAF: Environmental and social safeguards

Independent study services

How Wert-Berater Financial can support your feasibility study

Wert-Berater Financial can formulate a project feasibility case or review an existing study, integrating market evidence, financial projections, economic rationale and risk analysis for the selected CAF product.

Potential analytical scope

  • Project definition, demand and investment alternatives.
  • Costs, cash flow, funding structure and viability.
  • Material risks and gaps against the actual documentation request.

Feasibility requirements for the reviewed route

Generally expected

For a specific investment loan, CAF describes a previously formulated project case enabling viability and risk assessment. Confirm whether the requested package is a full study or another product-specific set of documents.

Sources: CAF: Products, services and project loans

We agree the scope against the actual lender request or terms of reference and identify source gaps, assumptions and specialist responsibilities. Engineering design, environmental certification, legal opinions and other licensed conclusions require appropriately qualified specialists. An independent study does not guarantee lender acceptance, financing or a consultant appointment.

Prepare an independent project assessment
01

About CAF: profile and operating context

CAF's current product guidance distinguishes a loan for a specific investment from a program, corporate need or portfolio supported through financial partners. For a specific operation, the client should have formulated the relevant technical, market, economic, financial, environmental and institutional characteristics so CAF can assess viability and its participation risk.

Its environmental and social approach includes preliminary risk classification, due diligence, an action plan and monitoring. That operational process should be reflected in the preparation budget and schedule; it is not satisfied by adding a generic environmental paragraph to a financial study.

Sectors in scope

  • Infrastructure
  • Water
  • Transport
  • Energy
  • Urban development
  • Industry
02

Turn a formulated project into an auditable case

A road, utility or urban investment needs a coherent relationship between the service objective, demand, asset specification, implementation and funding. Identify where the market study changes the design or phasing; a demand report and engineering budget that assume different capacities cannot simply be appended to one another.

For a public investment with limited direct revenues, show the budget or contractual mechanism that funds operation and renewal. For a private or mixed project, identify the payer and commercial arrangements. The economic benefits of improved access do not automatically become money available for debt service.

Sources: CAF: Products, services and project loans

03

Budget and schedule the environmental action plan

CAF's safeguards process follows the operation from origination through evaluation, formalization and administration. Record the cost and timing of applicable actions and retain unresolved obligations. An implementation delay can affect both project benefits and the financial case, even when the original construction cost estimate is unchanged.

Sources: CAF: Environmental and social safeguards

04

Agree the analytical assignment before commissioning

For a CAF-related assignment, identify the contracting party, financing product, project stage and the actual terms of reference first. A sponsor's study, a lender-appointed independent review and a competitively procured consultancy have different responsibilities, reliance provisions and deliverables.

Wert-Berater Financial can provide independent feasibility analysis, market research, financial modeling, economic analysis and agreed monitoring within its verified capabilities. Engineering design, legal opinions, environmental certification and other licensed work require appropriately qualified specialists. No institution-specific engagement or accreditation is claimed on this page.

The proposed scope should identify the information to be supplied, assumptions requiring verification, reporting currency, scenarios, review responsibility and permitted reliance. A study can identify unresolved risks or an unviable case; it cannot guarantee financing or replace the institution's own appraisal and credit decision.

Requirement register

What the reviewed sources say

Status labels describe the supplied source record, not a universal lender rule. Check the underlying document and current financing instrument.

TopicStatusInstrument / sovereign contextReviewed summarySources
feasibilityGenerally expectedSpecific investment/project loan and applicable environmental-social safeguards · instrument_specificFor a specific investment loan, CAF describes a previously formulated project case enabling viability and risk assessment. Confirm whether the requested package is a full study or another product-specific set of documents.CAF: Products, services and project loans
financialGenerally expectedSpecific investment/project loan and applicable environmental-social safeguards · instrument_specificThe investment formulation includes financial characteristics relevant to CAF's assessment. Reconcile investment needs, sources of funds, operating performance and downside funding requirements.CAF: Products, services and project loans
economicGenerally expectedSpecific investment/project loan and applicable environmental-social safeguards · instrument_specificEconomic characteristics form part of formulation for the specific operation. Explain the development rationale and alternatives separately from financial repayment capacity.CAF: Products, services and project loans
technicalGenerally expectedSpecific investment/project loan and applicable environmental-social safeguards · instrument_specificTechnical and institutional characteristics must be sufficiently formulated for viability review. Site, design, implementation and operating responsibilities require supported assumptions.CAF: Products, services and project loans
environmental_socialExplicitly requiredSpecific investment/project loan and applicable environmental-social safeguards · instrument_specificCAF describes environmental/social risk classification, due diligence, applicable safeguards, mitigation action plans and monitoring for credit operations. The exact measures depend on risk and operation type.CAF: Environmental and social safeguards
procurementProject-specificSpecific investment/project loan and applicable environmental-social safeguards · instrument_specificEstablish the applicable project procurement or advisory-contract route. A product description or past call for consultants is not proof of a current open assignment.CAF: Products, services and project loans

Related sectors

Follow the project thread.

Infrastructure Project Feasibility

Assess the need, alternatives, delivery structure, financial sustainability and development benefits of an infrastructure investment before treating it as ready for financing.

Healthcare Project Feasibility

Evaluate service demand, payer arrangements, operating capacity and financial sustainability for healthcare investment without equating a population shortage with commercially collectible demand.

Water and Wastewater Feasibility

Assess service needs, resource or treatment capacity, technical alternatives, tariffs and collections, operating sustainability and public benefits for water and wastewater investment.

Logistics Project Feasibility

Evaluate freight demand, network position, throughput, contracts, capacity, investment and operating economics for logistics facilities and supporting infrastructure.

Source register

Documents behind this page

  1. CAF: Products, services and project loans Checked 2026-11-22 · Distinguishes project loans, programs, financial partners and advisory services.
  2. CAF: Environmental and social safeguards Checked 2026-11-22 · Risk categorization, due diligence, action plans and monitoring vary with the operation.
  3. caf calls — official procurement information Checked 2026-11-22 · Official procurement information was retrieved. Portal access is not a consultant registration, shortlist, contract award or claim that any individual notice is still open.

Continue the review

Related requirements and analytical services

Latin America and the Caribbean

Inter-American Development Bank

Development financing for public priorities in Latin America and the Caribbean, informed by country strategies, project quality, development effectiveness and implementation capacity.

Latin America and the Caribbean

IDB Invest

Private-sector development investment in Latin America and the Caribbean, with commercial, financial, development and environmental/social assessment.

Central America and eligible CABEI member-country operations

Central American Bank for Economic Integration

Regional development investment and integration; the reviewed current sources establish procurement responsibilities, not a complete bank-wide loan application package.

All development-finance research · Discuss financial modeling · Institutional team or procuring authority?

Questions in context

Frequently asked questions

Does every CAF application require the same feasibility report?

CAF expects the characteristics of a specific investment to be formulated so viability and risk can be assessed. The appropriate report and supporting documents depend on the product and operation; there is no claimed universal independent-report mandate across all CAF services.

Does commissioning Wert-Berater secure a development-bank loan or consultant appointment?

No. Wert-Berater Financial is an independent analytical services firm, not a lender, financing intermediary or authorized representative of the institutions listed. Financing and procurement decisions remain with the responsible institution or contracting authority.

What should I provide for a CAF-related scope discussion?

Provide the country, public/private/mixed borrower, investment or program scope, proposed CAF product, development purpose, technical and market work, financing plan, safeguards status and written information request.

01

Start with the project, not a financing promise

Share enough context to scope an independent analytical discussion. Required fields are marked.

Institution of interest

CAF

Enter an amount only when known. Do not include a currency symbol.
Enter an amount only when known. Do not include a currency symbol.
Required if either amount is supplied. Currency is never assumed.
Up to 3 files; 10 MiB combined. PDF, DOCX, XLSX, PNG or JPG. Files are retained privately for intake, not published or shared through public links. Do not send privileged or highly sensitive records.

No information is sent until you select Submit. An inquiry is not a financing application, approval or promise of funding.

Independent analytical support

Prepare the evidence, without implying a lender relationship.

Engagement scope, deliverables and reliance are agreed separately. Specialist legal, engineering and environmental work may require separate qualified professionals.

Prepare an independent project assessment

Country and regional connections

Continue the regional analysis

These are research connections, not determinations of country eligibility, financing availability or institutional affiliation. Confirm the country, financing instrument and institution mandate for the actual project.

Engagements Completed
4,000+
SBA Studies Accepted by Lenders
1,300+
USDA Studies in Agency Financing
950+
Project Value Evaluated
$43.8B
Feasibility Consultants Since
1998

Thousands of real estate, business, and machinery appraisal and litigation assignments.