Skip to content
Independent analysis for capital decisions
Wert-Berater Financial

Eligible AIIB members and qualifying operations · multilateral

Asian Infrastructure Investment Bank

Infrastructure investment with project-specific technical, economic, financial, environmental, social and implementation assessment.

AIIB eligibility is determined under the relevant product and project mandate · Sovereign-backed and nonsovereign operations; preparation support has separate eligibility

Financing focus

What AIIB finances

Infrastructure such as energy, transport, water, digital networks and urban development through eligible sovereign-backed and nonsovereign financing. Preparation support has separate eligibility conditions.

Financing products and routes in the reviewed sources

  • Sovereign-backed financing
  • Nonsovereign financing
  • Eligible project-preparation support

These examples describe the reviewed routes, not a complete product catalogue or an eligibility determination. Current country, borrower, financing and procurement conditions must be confirmed for the actual project.

Sources: AIIB: Project process · AIIB: Project application frequently asked questions

Independent study services

How Wert-Berater Financial can support your feasibility study

Wert-Berater Financial can develop preliminary or full feasibility analysis, financial models and economic assessments appropriate to the project stage and the AIIB team's actual information request.

Potential analytical scope

  • Infrastructure demand, options and project definition.
  • Capital and operating costs, revenues and financing scenarios.
  • Economic benefits, implementation readiness and key risks.

Feasibility requirements for the reviewed route

May be required

AIIB identification material may include preliminary or final feasibility studies; the exact readiness and appraisal information is determined with the project team.

Sources: AIIB: Project process

We agree the scope against the actual lender request or terms of reference and identify source gaps, assumptions and specialist responsibilities. Engineering design, environmental certification, legal opinions and other licensed conclusions require appropriately qualified specialists. An independent study does not guarantee lender acceptance, financing or a consultant appointment.

Prepare an independent project assessment
01

About AIIB: profile and operating context

AIIB's published project process says identification material may include a brief project summary and preliminary or final feasibility studies. That wording is important: the documentation evolves with preparation and appraisal rather than representing a single universal final-study requirement for every first approach.

The Bank's application FAQ distinguishes a project's ordinary preparation costs from support under a preparation facility. Private sponsors normally fund their preparation, while exceptional support and member eligibility need specific confirmation. A general expression of interest is not an entitlement to a grant that pays a consultant's invoice.

Sectors in scope

  • Infrastructure
  • Energy
  • Transport
  • Water
  • Digital infrastructure
  • Urban development
02

Separate preparation support from project financing

A project can need a feasibility study without qualifying for a preparation grant. First establish the operation's relationship to AIIB, the prospective borrower, the applicable preparation mechanism and who is authorized to commission the work. Do not begin from the assumption that a study fee will later be reimbursed.

A useful readiness assessment lists what is already completed, what depends on site access or counterpart action, and which technical, commercial and safeguards decisions remain open. The resulting work plan can then price the missing analysis without presenting an early concept as ready for final financing approval.

Sources: AIIB: Project process · AIIB: Project application frequently asked questions

03

Make the implementation structure visible

Infrastructure forecasts should connect procurement packages and completion milestones to spending, disbursement and the first operating revenues. Explain the project management unit, reporting responsibilities and capacity gaps. A funding plan that omits supervision, maintenance or required mitigation can be incomplete even when its construction budget appears balanced.

Sources: AIIB: Project process

04

Agree the analytical assignment before commissioning

For a AIIB-related assignment, identify the contracting party, financing product, project stage and the actual terms of reference first. A sponsor's study, a lender-appointed independent review and a competitively procured consultancy have different responsibilities, reliance provisions and deliverables.

Wert-Berater Financial can provide independent feasibility analysis, market research, financial modeling, economic analysis and agreed monitoring within its verified capabilities. Engineering design, legal opinions, environmental certification and other licensed work require appropriately qualified specialists. No institution-specific engagement or accreditation is claimed on this page.

The proposed scope should identify the information to be supplied, assumptions requiring verification, reporting currency, scenarios, review responsibility and permitted reliance. A study can identify unresolved risks or an unviable case; it cannot guarantee financing or replace the institution's own appraisal and credit decision.

Requirement register

What the reviewed sources say

Status labels describe the supplied source record, not a universal lender rule. Check the underlying document and current financing instrument.

TopicStatusInstrument / sovereign contextReviewed summarySources
feasibilityMay be requiredProject identification and appraisal; preparation-fund eligibility assessed separately · instrument_specificAIIB identification material may include preliminary or final feasibility studies; the exact readiness and appraisal information is determined with the project team.AIIB: Project process
financialGenerally expectedProject identification and appraisal; preparation-fund eligibility assessed separately · instrument_specificAppraisal and diligence examine financial aspects and project readiness. Show the financing plan, operating assumptions and implementation funding appropriate to the selected sovereign or nonsovereign product.AIIB: Project process
economicGenerally expectedProject identification and appraisal; preparation-fund eligibility assessed separately · instrument_specificEconomic assessment is part of the project process. Explain the infrastructure need and alternatives without treating broader benefits as cash available to repay a project loan.AIIB: Project process
technicalGenerally expectedProject identification and appraisal; preparation-fund eligibility assessed separately · instrument_specificThe process assesses technical quality, implementation arrangements and project readiness. Resource, design and performance assumptions need appropriate specialist support.AIIB: Project process
environmental_socialGenerally expectedProject identification and appraisal; preparation-fund eligibility assessed separately · instrument_specificEnvironmental and social assessment is part of preparation and appraisal. Required instruments depend on the project and applicable policy rather than on an adviser’s generic checklist.AIIB: Project process
procurementProject-specificProject identification and appraisal; preparation-fund eligibility assessed separately · instrument_specificEstablish procurement and implementation arrangements in the operation. The preparation-fund FAQ does not create a private sponsor's automatic right to consultant reimbursement.AIIB: Project process · AIIB: Project application frequently asked questions

Related sectors

Follow the project thread.

Infrastructure Project Feasibility

Assess the need, alternatives, delivery structure, financial sustainability and development benefits of an infrastructure investment before treating it as ready for financing.

Energy Project Feasibility

Assess the demand, technical solution, fuel or resource supply, contractual revenues, investment requirements and financial resilience of an energy project.

Renewable Energy Feasibility

Examine resource-supported production, grid connection, offtake, construction, operating costs and financing resilience for renewable-energy investment.

Water and Wastewater Feasibility

Assess service needs, resource or treatment capacity, technical alternatives, tariffs and collections, operating sustainability and public benefits for water and wastewater investment.

Transportation Project Feasibility

Analyze travel or freight demand, alternatives, service performance, capital and operating costs, financing and economic benefits of transportation investment.

Source register

Documents behind this page

  1. AIIB: Project process Checked 2026-11-22 · Identification documents may include preliminary or final feasibility studies; requirements remain project- and instrument-specific.
  2. AIIB: Project application frequently asked questions Checked 2026-11-22 · Distinguishes ordinary sponsor preparation costs from special project-preparation support.
  3. aiib procurement — official procurement information Checked 2026-11-22 · Official procurement information was retrieved. Portal access is not a consultant registration, shortlist, contract award or claim that any individual notice is still open.

Continue the review

Related requirements and analytical services

Global — eligible World Bank borrowing countries

World Bank

Development financing and knowledge for public priorities, with project, results-based and policy instruments that must not be treated as one application product.

Developing IFC member countries

International Finance Corporation

Private-sector development investment in eligible developing countries, subject to technical soundness, commercial prospects, development benefits and environmental and social acceptability.

European Union and eligible operations outside the EU

European Investment Bank

Investment aligned with EIB and European Union objectives, assessed for eligibility and project quality rather than solely the sponsor's projected return.

All development-finance research · Discuss financial modeling · Institutional team or procuring authority?

Questions in context

Frequently asked questions

Does every AIIB application require the same feasibility report?

AIIB's process says preliminary or final feasibility studies may be part of identification material. Confirm what is required for the actual operation and review stage. Preparation-fund eligibility is a separate question.

Does commissioning Wert-Berater secure a development-bank loan or consultant appointment?

No. Wert-Berater Financial is an independent analytical services firm, not a lender, financing intermediary or authorized representative of the institutions listed. Financing and procurement decisions remain with the responsible institution or contracting authority.

What should I provide for a AIIB-related scope discussion?

Provide the member country, borrower and guarantor status, infrastructure scope, project stage, AIIB contact or preparation-facility reference, existing studies, intended financing and known readiness gaps.

01

Start with the project, not a financing promise

Share enough context to scope an independent analytical discussion. Required fields are marked.

Institution of interest

AIIB

Enter an amount only when known. Do not include a currency symbol.
Enter an amount only when known. Do not include a currency symbol.
Required if either amount is supplied. Currency is never assumed.
Up to 3 files; 10 MiB combined. PDF, DOCX, XLSX, PNG or JPG. Files are retained privately for intake, not published or shared through public links. Do not send privileged or highly sensitive records.

No information is sent until you select Submit. An inquiry is not a financing application, approval or promise of funding.

Independent analytical support

Prepare the evidence, without implying a lender relationship.

Engagement scope, deliverables and reliance are agreed separately. Specialist legal, engineering and environmental work may require separate qualified professionals.

Prepare an independent project assessment

Country and regional connections

Continue the regional analysis

These are research connections, not determinations of country eligibility, financing availability or institutional affiliation. Confirm the country, financing instrument and institution mandate for the actual project.

Engagements Completed
4,000+
SBA Studies Accepted by Lenders
1,300+
USDA Studies in Agency Financing
950+
Project Value Evaluated
$43.8B
Feasibility Consultants Since
1998

Thousands of real estate, business, and machinery appraisal and litigation assignments.