Travel center: fuel, convenience retail, and QSR
Project Summary
Feasibility analysis of a travel center combining branded fuel, convenience retail, and quick-service restaurant operations on the Interstate 5 corridor at Castle Rock, Cowlitz County — the I-5 gateway between Portland and Seattle traffic and the Mount St. Helens recreation draw — evaluated for SBA 504 financing.
What the Project Included
Component-level revenue modeling across fuel gallons, inside sales, and QSR; corridor traffic capture analysis; and a complete 160-slide study supported by a 65-tab model in which every figure links to the assumptions tab — ten-year pro forma, sensitivity at ±5/10/15 percent, interest-rate stress, and the full ratio suite benchmarked against industry data.
Capital Structure
SBA 504 structure: senior bank first mortgage, CDC debenture, and borrower equity injection, with fixed-asset eligibility and occupancy requirements confirmed under the program rules.
Feasibility Study Challenges
High-coverage deals carry their own analytical burden: a 3.12x Year 1 DSCR invites the question of whether the revenue model is too optimistic, so the study’s work was defending the fuel-volume and inside-sales assumptions against corridor traffic data and industry benchmarks — proving the coverage was earned by the site, not assumed by the model. Margin compression and competitive-entry scenarios left repayment capacity intact in every case tested.