Boutique marina hospitality redevelopment with floating lodging units
Project Summary
Redevelopment of an existing Hudson River waterfront marina site in Catskill, Greene County, into a professionally managed boutique hospitality operation combining upland luxury suites with purpose-built floating lodging units — an integrated, revenue-generating hospitality business rather than a passive real estate investment, intentionally positioned between high-end boutique hotels and experiential lodging. The absence of a full-service restaurant reduces operational complexity, and staffing is structured to comparable boutique benchmarks.
What the Project Included
The floating lodging units are the competitive core: a product type scarce in the regional market and increasingly sought by experiential travelers, centrally owned and managed unlike peer-to-peer floating accommodations. The study evidenced the typology premium from a national comparable set of floating-lodging operators, supporting an ADR adjustment of $150–$250 over land-based equivalents, with phased deployment of additional floating units providing concept scalability. Eligibility screens confirmed compliance with the program’s ineligible-business rules and, where an Eligible Passive Company structure is used, conformance to the applicable operating-control and lease-term requirements.
Capital Structure
A proposed SBA-guaranteed loan of approximately $6,991,250 — roughly 75 percent of total project cost — with the balance funded through borrower equity of approximately $2,308,750. Sources and uses were reviewed to confirm all costs relate directly to the eligible operating business, with no allocation to speculative land holding or passive investment.
Feasibility Study Challenges
The underwriting tension was typology risk against coverage cushion: a floating-lodging product with no direct local comparable had to be priced from national evidence, while early-year DSCR of 1.26x sits closer to program minimums than the stabilized 1.53x — so the ten-year DSCR analysis, marina and waterfront permitting pathway (state environmental and federal dock permitting), and phased capital deployment carried the conditions.