IndependenceFor lender-commissioned feasibility studies, fiduciary duty runs to the lender and agency — not to the borrower. Other assignments follow their signed engagement scope. Determinations are independent and never revised under commercial pressure.  ·  International assignments accepted case by case.
Approved project summary

Concluded-use development cost — branded express tunnel car wash with national drive-through ground-lease pad; indicated stabilized value approximately $19,375,000

Location: Chino, San Bernardino County, California, USALocation status: Coarse location; map pin available.Project type: Highest & Best UsePrograms: HBU Consulting · Land Residual Analysis

Project Summary

A highest and best use study of a commercial corridor parcel in Chino, California, evaluated under the four required tests of legal permissibility, physical possibility, financial feasibility, and maximal productivity. The candidate uses screened included retail-only development, mixed-use development, a gasoline station with ground-lease pad, and an express tunnel car wash with ground-lease pad, in both branded and unbranded configurations.

Residual Analysis

A land residual indications grid was constructed for each feasible use, deriving stabilized net operating income, applying market capitalization rates, and netting total development cost to an implied land residual. Retail-only development produced a comparatively low residual; mixed-use development at approximately $38 million of cost did not support land value at current cost and rent levels; the gasoline alternative performed strongly but carries environmental and fuel-margin volatility; and the branded car wash plus pad configuration produced the highest residual of the set.

Concluded Use

The branded express tunnel car wash integrated with a national drive-through ground-lease pad demonstrated strong capital efficiency, balanced active and passive income, a manageable stabilization timeline, and favorable financing capacity — the configuration that generates the most value relative to cost among the tested programs. A corridor car wash saturation analysis was performed to confirm depth of unmet demand before the use was concluded.

Feasibility Study Challenges

The discipline of the engagement lay in keeping the screening honest: each alternative was carried through the full four-test sequence rather than eliminated early, so that the conclusion rests on a complete comparative record — including the finding that a financially feasible use (the gas station alternative) is nonetheless not maximally productive once environmental exposure and margin volatility are priced.

Legal disclosure. Wert-Berater, Inc. offices are mailing addresses only. Following the COVID-19 pandemic the firm has elected to work remotely; its office locations receive mail and are not staffed for visitors or in-person meetings. Headquarters mailing address: 1968 South Coast Hwy, Ste 2382, Laguna Beach, CA 92651.

Wert-Berater, Inc. is an independent provider of feasibility studies and other related services. The firm does not provide financing or equity investment advice, and does not arrange, broker, or place debt or equity capital of any kind.

All appraisal assignments are performed by Bruce E. Jones, MAI, ASA-GC, BCA, CMEA, a member of the Appraisal Institute since 2006, a staff member of Wert-Berater, Inc. and owner of Special Purpose Realty Valuation.