Full-service lake marina and resort operation
Project Summary
Feasibility analysis of a full-service marina and resort operation on Lake Cumberland — one of the largest reservoirs east of the Mississippi and among the busiest houseboating destinations in the United States — evaluated for a USDA Business & Industry guaranteed loan under Instruction 5001 in a rural Kentucky county where the marina is a primary economic anchor.
What the Project Included
Multi-revenue-stream marina underwriting: wet-slip and dry storage rental, houseboat and watercraft rental fleets, fuel sales, service and repair, ship’s store, and food and beverage — each modeled against lake-level operating constraints, seasonality, and the destination tourism draw of the Lake Cumberland market.
Capital Structure
USDA B&I guaranteed loan structure consistent with Instruction 5001 rural-area eligibility, collateralized by the marina’s real property, improvements, and operating assets.
Feasibility Study Challenges
Marina underwriting on a flood-control reservoir lives with the water level: seasonal drawdowns and multi-year lake-level management decisions directly drive slip utility, rental-fleet season length, and revenue timing, so the analysis had to demonstrate debt service capacity across the operating calendar rather than at a single stabilized point — alongside the concentration risk inherent in a destination market where the asset is both the business and the draw.