Independent Market Intelligence & Feasibility Advisory

SBA · USDA · EB-5 · Conventional · Since 1998
+1 310-857-2443 ext. 800
Laguna Beach – Dallas – Miami – Jersey City
IndependenceFor lender-commissioned feasibility studies, fiduciary duty runs to the lender and agency — not to the borrower. Other assignments follow their signed engagement scope. Determinations are independent and never revised under commercial pressure.  ·  International assignments accepted case by case.
Approved project summary

Major-brand truck stop: 4,000 SF c-store with gasoline and diesel canopies on 6 acres

Location: Delhi, Merced County, California, USALocation status: Coarse location; map pin available.Project type: Travel Center & FreightPrograms: SBA-Backed

Project Summary

Proposed development of a major-brand truck stop on a 6-acre parcel at the southeast corner of CA-99 and Shanks Road in Delhi, Merced County — a 4,000-square-foot convenience store with a 4,000-square-foot gasoline canopy and a 3,000-square-foot diesel canopy serving the Golden State Highway truck corridor between the Bay Area and Southern California. Year 1 sales are projected above $61,000,000, growing three percent annually, with total revenues exceeding $60,000,000 at stabilization.

What the Project Included

The market analysis was built on corridor truck-traffic counts along CA-99, a captive and diverse demand base with limited direct competition in the immediate trade area, and seasonality patterns specific to Central Valley freight movement. Fuel gross margins were set at the ten percent industry standard, the technical analysis confirmed soils, grading, and drainage suitable for cost-effective construction, and a Phase I Environmental Site Assessment completed under CEQA returned no recognized environmental conditions.

Capital Structure

Financing through a combination of equity and long-term SBA-backed debt at a conservative loan-to-value ratio, with annual debt service of $675,000 covered by projected EBITDA at better than 4.0x in every projection year — coverage headroom that holds under the cost-inflation, competition, and margin-compression scenarios tested.

Feasibility Study Challenges

High-revenue, thin-margin fuel retail lives on the margin line, so the sensitivity analysis concentrated there: per-gallon margin reduction scenarios, competitive entry, and economic-cycle stress all left debt service comfortably covered, and no adverse scenario tested threatened the ability to meet obligations. The remaining work identified by the study is execution — finalizing the SBA-backed financing structure and phasing staffing to actual traffic capture as the site ramps.

Legal disclosure. Wert-Berater, Inc. offices are mailing addresses only. Following the COVID-19 pandemic the firm has elected to work remotely; its office locations receive mail and are not staffed for visitors or in-person meetings. Headquarters mailing address: 1968 South Coast Hwy, Ste 2382, Laguna Beach, CA 92651.

Wert-Berater, Inc. is an independent provider of feasibility studies and other related services. The firm does not provide financing or equity investment advice, and does not arrange, broker, or place debt or equity capital of any kind.