Independent Market Intelligence & Feasibility Advisory

SBA · USDA · EB-5 · Conventional · Since 1998
+1 310-857-2443 ext. 800
Laguna Beach – Dallas – Miami – Jersey City
IndependenceFor lender-commissioned feasibility studies, fiduciary duty runs to the lender and agency — not to the borrower. Other assignments follow their signed engagement scope. Determinations are independent and never revised under commercial pressure.  ·  International assignments accepted case by case.
Approved project summary

Major-brand gas station expansion — new-construction convenience store

Location: Mountain Home, Elmore County, Idaho, USALocation status: Coarse location; map pin available.Project type: Fuel RetailPrograms: SBA 504

Project Summary

Feasibility study of a proposed SBA-financed expansion at an established major-brand fuel site in Mountain Home, Elmore County — razing a structure dating to 1962 and constructing a new 2,200-square-foot convenience store to capture inside-sales margin at a location whose fuel business is already proven. Stabilized Year 1 operations are projected at approximately $4,200,000 in revenue and approximately $246,000 of net operating income, confirming that the core business is viable before the expansion premium is counted.

What the Project Included

The budget allocates $1,200,000 to the new convenience store building — 82.8 percent of total project cost, or $545 per square foot — a concentration the study defended explicitly: inside sales, not fuel, generate the majority of gross margin, so directing capital to the dominant revenue driver is the correct underwriting posture. SBA and lender fees of $85,000 represent a conservative 5.9 percent of cost for a multi-party 504 structure, and $120,000 of initial working capital — 8.3 percent — sits inside the five-to-ten percent range lenders treat as reasonable without overcapitalization.

Capital Structure

An SBA 504 loan of $1,235,000 amortized over 25 years at an assumed 10.75 percent interest rate against $1,450,000 of fixed, known, and fully funded project costs, producing annual debt service of approximately $142,582 covered at 1.73x from initial stabilized operations.

Feasibility Study Challenges

The discipline in this study was scale honesty: the pro forma deliberately does not project demand beyond what is feasible within a neighborhood-scale convenience format, the 10.75 percent rate assumption builds in rate stress rather than optimism, and the sensitivity analysis tested whether the business as it exists — not as it might become — sustains the proposed debt. Coverage at 1.73x initial, improving thereafter, answered the question affirmatively under SBA SOP 50 10 underwriting standards.

Legal disclosure. Wert-Berater, Inc. offices are mailing addresses only. Following the COVID-19 pandemic the firm has elected to work remotely; its office locations receive mail and are not staffed for visitors or in-person meetings. Headquarters mailing address: 1968 South Coast Hwy, Ste 2382, Laguna Beach, CA 92651.

Wert-Berater, Inc. is an independent provider of feasibility studies and other related services. The firm does not provide financing or equity investment advice, and does not arrange, broker, or place debt or equity capital of any kind.

All appraisal assignments are performed by Bruce E. Jones, MAI, ASA-GC, BCA, CMEA, a member of the Appraisal Institute since 2006, a staff member of Wert-Berater, Inc. and owner of Special Purpose Realty Valuation.

Services  ·  Experience

© 1998–2026 Wert-Berater, Inc. All rights reserved.