Geothermal-heated greenhouse and nursery enterprise — 20+ acres under glass
Project Summary
Acquisition of an established greenhouse and nursery enterprise in Radium Springs, Doña Ana County — more than 20 acres of geothermal-heated greenhouses with secured groundwater rights providing 2.3 times the water required at full production, evaluated for a USDA Business & Industry guaranteed loan under Regulation 5001. The site sits 20 minutes from Las Cruces, 1.5 hours from El Paso, and within same-day distribution reach of markets across New Mexico, Texas, and Arizona, in a national nursery and garden industry generating more than $54 billion annually.
What the Project Included
The economic feasibility analysis confirmed labor availability through the county’s agricultural workforce and the plant- and soil-science graduate pipeline from the nearby land-grant university; the technical analysis confirmed that geothermal heating materially reduces energy-price exposure while the secured water rights neutralize the binding constraint on greenhouse operations in the arid Southwest; and the market analysis benchmarked the operation against regional and national competitors, most of which operate with limited capital reserves.
Capital Structure
Purchase of business assets of $16,500,000 funded by the USDA-guaranteed loan plus equity; $100,000 of working capital contributed by the borrower; and $750,000 of closing costs and fees funded from loan proceeds, consistent with USDA B&I norms — a total project cost of $17,350,000.
Feasibility Study Challenges
The rate structure carried the principal risk: the B&I loan floats on a Wall Street Journal prime-based adjustable rate, so the study stress-tested coverage against rate movement and a five percent operating-cost increase, with DSCR remaining above the USDA minimum in each case. Competitive pressure from regional growers and the seasonality of nursery demand were addressed through capacity-utilization analysis and a distribution strategy spanning three states, and the break-even calculations required under 5001.203(i) confirmed solvency margins throughout the projection period.