Wert-Berater, Inc.
Direct: +1 310-857-2443 ext. 800
Hydroelectric Power Feasibility Studies
Independent Feasibility Study Consultants · Since 1998

Hydroelectric Power feasibility studies your lender will rely on.

Independent, lender-grade hydroelectric analysis with a fully linked financial model — delivered in 10 to 15 business days by the firm behind 4,000+ studies since 1998.

4,000+
studies since 1998
$40.2B
project value evaluated
10–15
business days standard delivery
1,280
SBA studies accepted

Who we are

Wert-Berater, Inc. has prepared independent feasibility studies for lenders, certified development companies, and federal agencies since 1998 — more than four thousand engagements representing $40.2 billion in evaluated project value across all fifty states and international assignments. Our fiduciary duty runs to the lender and the agency, never to the sponsor’s optimism: fees are fixed, quoted up front, never contingent on findings, and a determination is never changed under pressure.

“Every claim sourced. Every risk stated plainly. Independence is non-negotiable.”

What we do

Hydro feasibility joins hydrology to licensing: the flow record and its variability, FERC licensing or exemption position as the gating condition, PPA or merchant revenue, and the civil-works capital that dominates the budget. Small and run-of-river projects are evaluated against their specific flow regimes with dry-year cases carried in the model.

How we do it

Methodology uses USGS flow records, energy modeling across hydrological cases, licensing-status review, and civil capital benchmarks. Coverage is tested on dry-year production under contracted revenue.

How we can help you

Clean-energy engagements are prepared to USDA RD Instruction 5001 where REAP and B&I apply — including the energy-production documentation, incentive analysis, and payback arithmetic REAP requires — and to conventional and institutional standards otherwise, with interconnection and incentive risk addressed directly rather than assumed away. Representative clean-energy work includes a $52,688,000 green carbon project evaluation and renewable-energy feasibility within the firm's USDA REAP and B&I practice.

How to engage us

1
Request a fee quote with the form on this page — an engagement-specific quote follows within one business day.
2
Execute a mutual NDA online in two minutes; the executed PDF arrives by email before any document changes hands.
3
Upload project documents to our secure, access-controlled intake.
4
Book a Zoom qualification call directly on the calendar — your time zone, 30 to 60 minutes.

Standard delivery is 10 to 15 business days from complete project data. Rush delivery for deals already in underwriting is accepted case by case for an additional fixed fee, quoted up front and committed in writing. Engagements are typically initiated by the borrower, with lender or CDC confirmation obtained before work begins — institutions differ, so confirm the procedure with your lending contact.

Order Your Study

Engagement-specific fee quote within one business day. Fixed fee, quoted up front, never contingent on findings.

All information you provide is held in strict confidence and is used solely to evaluate and prepare your engagement. We do not disclose project data to third parties except as required to complete the financing you authorize.
Prefer to talk first? +1 310-857-2443 ext. 800
Or book a Zoom qualification call · execute an instant NDA
←  Back
Wert-Berater, Inc. · 1968 South Coast Hwy, Ste 2382, Laguna Beach, CA 92651 · 111 Town Square Pl Ste 1238 PMB 657834, Jersey City, NJ 07310 · 539 W. Commerce St #8486, Dallas, TX 75208 · +1 310-857-2443 ext. 800 · Privacy · Cookie Preferences · Terms · wert-berater.com